Ridge were appointed as MEP Engineers to work alongside a wider design team in the full refurbishment of three floors to this central Manhattan building.
The brief was to increase occupant space on each floor plate to collocate the occupants of two office locations, whilst providing a 21st century workplace environment.
The building works had to be designed around a live working environment. MEP services were designed to meet the needs of the present occupants whilst also being replaced with new.