Sorry, www.ridge.co.uk is not supported by Internet Explorer.
The project presented a number of challenges due to the location of the site which is flanked by live manufacturing buildings on all four sides.
Ridge worked closely with the client team, the press supplier and the contracting team to design a phased construction project that accommodated the complex structural and mechanical requirements.
The project included:
The project was delivered in an extremely tight programme through robust BIM procedures and integrated 3D working ethos between the Ridge design team and the specialist sub-contractors.