Ridge was appointed on this project from Outline Business Case stage to User Commissioning.
The works consist of the strip out of the existing Bernard Sunley Ward on Level 2 to create two new operating theatres and ancillary spaces, including the provision of new plant space located on a raised deck externally.
On Level 1 the existing 4-theatre complex will be refurbished in its existing configuration with elements of major alteration to provide an enlarged recovery space.
Ridge produced the cost plan, which was based on a BIM Model that was updated throughout the life of the project.