Pontoon Dock and Hartley Health Centres – Life Cycle Cost Assessments
Building financial certainty
-
Client Health and Care Space Newham Limited
-
Location London
When you're responsible for a building long term, what it costs to run matters just as much as what it costs to build.
Health and Care Space Newham Limited (HCSN) asked us to prepare Life Cycle Cost assessments for Pontoon Dock Health Centre and Hartley Health Centre, providing greater certainty around their long-term costs.
Looking beyond the construction cost
HCSN’s two health centres were at different stages, with one already operational and the other under construction. Both were subject to lease arrangements, so HCSN needed to understand not just the initial investment, but the cost of maintaining, operating and replacing the elements they were responsible for over each lease period.
We were appointed to provide cost and commercial management services, preparing Life Cycle Cost assessments covering both the buildings and HCSN's fit out works.
With different levels of information available for each project, we couldn’t simply apply the same approach to both. We reviewed the available data, visited both sites and helped HCSN identify their maintenance and replacement responsibilities.
Building a reliable picture
We drew together the available data, tested assumptions and identified where more detail was needed. At Pontoon Dock, we tested our model against the client's actual energy and facilities management costs, providing a useful check against the benchmark data used for Hartley.
Our analysis considered capital, operation, maintenance and replacement costs, showing how expenditure could build up over the life of each building.
Making the numbers useful
The work wasn't just about producing a report. HCSN wanted to understand how the costs would feed into their wider financial planning and lease arrangements.
We explained the findings and presented them in a format HCSN could use alongside their wider appraisal, giving them a clearer view of future costs and reducing the risk of underestimating expenditure. Across the two centres, we modelled around £20 million of whole-life expenditure over assessment periods of 25 and 40 years.
The assessments revealed that operational costs were the largest driver of whole-life expenditure at Pontoon Dock, while construction and renewal costs were more significant at Hartley. HCSN now has a clearer picture of future costs to support their long-term planning and budgeting.
-
2
health centres assessed
-
£20m
whole-life expenditure modelled
-
25 and 40 years
whole-life assessment periods
Explore projects
Residential
Shaping smarter servicing strategies for retirement living
Pegasus Homes – M&E Strategic Cost Advice
Nationwide
Affordable housing
Creating clarity across a complex asset portfolio
Southampton City Council – Asset Management Strategic Review
Hampshire
Affordable housing
Refreshing survey data across 23,000 homes
Sandwell Metropolitan Borough Council – Stock Condition Surveys
West Midlands
Affordable housing
Strengthening homes, compliance and customer experience
Stevenage Borough Council – Multiple Projects
Various
Let's talk
We're closer than you think. 16 UK offices, national expertise and a genuine interest in making your project perform. Let's start with a conversation.