Donington Park Resurfacing
Refreshing one of the UK’s best-known racing circuits
-
Location Derbyshire
-
Sector Motorsport
Services
-
Civil engineering
-
Construction training and supervision
-
Detailed track design
-
Motorsport track design
-
Multidisciplinary
-
Track upgrades and refurbishment
Donington Park needed a full circuit resurfacing that could improve performance without disrupting the upcoming racing season.
The challenge was delivering complex works safely and accurately within a tight off-season programme.
Delivering a high-pressure resurfacing programme
Working within a live motorsport environment meant every stage of the programme demanded careful coordination.
We delivered civil engineering and race track design services, working closely with Aggregate Industries and MotorSport Vision throughout the 22-day resurfacing programme. More than 6,500 tonnes of asphalt were replaced, with up to 100 people on site during peak activity.
Our team supported sequencing, technical delivery and quality assurance throughout the works, helping to maintain programme momentum while ensuring the finished surface met performance expectations.
Improving grip, consistency and performance
Resurfacing one of the UK’s best-known circuits required more than simply replacing asphalt. The new surface needed to improve driver confidence and deliver consistent performance across different racing series.
Close collaboration between the client, contractor and design teams helped resolve issues quickly and maintain quality throughout the programme.
The finished surface delivered a clear improvement in grip, with early British Superbike Championship data showing lap times more than a second faster than previous records.
Supporting the future of the circuit
The resurfacing has helped extend the long-term usability of Donington Park while improving the experience for competitors and organisers alike.
The result is a circuit ready for the demands of modern motorsport, delivered within a tightly controlled programme window and without disruption to the racing calendar.
-
2.5
miles of circuit resurfaced
-
6,500+
tonnes of asphalt replaced
-
22
days of construction
Explore motorsport projects
Motorsport
Creating a shared home for motorsport in Central Queensland
Rockhampton Motorsports Precinct
Queensland, Australia
Motorsport
Shaping a motorsport destination in the hills of Maharashtra
Nanoli Speedway
India
Motorsport
Blending performance driving with lifestyle and innovation
Motorsports Gateway Automotive Development
Michigan, United States
Motorsport
Bringing motorsport back to the city streets
MotoFest Coventry Sprint Circuit
Coventry